About Us
Core Value
Our Quality Commitment   
 
 
  our quality commitment    
   
 
  The Management of is committed to quality and continual improvement in all areas of the organization by providing adequate infrastructure & resources at all level of the organization

We will work as a team and with positive attitude. Every employee will involve himself in the continual improvement of business / QMS processes & resources. This will result in the achievement of corporate and functional objectives efficiently, effectively and thus the customer will always be satisfied.

Each employee will maintain focus on satisfaction of internal customer / vendor needs and relationship. This must result in improvement of quality products, services and customer satisfaction. Each and every employee will not allow quality to take second place behind cost or schedule. All employees have the right to question their supervisor’s decisions or actions if they feel that quality is being compromised.

AEPL’s management is committed to the health and safety of employees in relation to the company’s business operations. We want to be our customer’s preferred supplier by following the above policy.
 
 
 
 
   
 
 
 
 
The production department is totally responsible to achieve the required standards in quality of finished goods. For this purpose, the quality assurance department has full powers to ensure that requisite step of quality are mentioned.
   TOP
 
All raw material and sub-assembles viz, casting, forging, bars plates and hardware etc. are procedure as per approved technical specification or specify relevant standards.

Only material as per technical specifications approved by quality assurance department are accepted and stored in a raw materials stores.

For the incoming materials the inward in-charge records the data in the inward register. The quality assurance department is informed through in slip and the incoming material stored in the receiving inspection area, until clearance by quality assurance department.

100% inspection or alternatively as per sampling plan laid down in ISO 2500(Part |) is carried out in accordance with the quality assurance plan for each product.

The quality assurance department arranges to send the test bars and other materials to reputed chemical and physical laboratory for chemical composition test. Material Test Certificates on various part - Body, Bonnet, Ball & Components material are obtained in advance with the Quality Assurance Plan.

The parts components sub-assemblies found to be OK are tagged with OK sticker and signature of Quality Assurance Engineer. The rejected parts and materials are marketed with REJECTED tags and returned to the suppliers/ Sub contractors.

Quality Assurance Engineer verifies the size, pressure ,rating, material, code, manufactures, emblem, arrow mark flow for direction, heat, number etc. On the casting before acceptance. The accepted casting body and bonnets are hard punched with the serial number and marked with green painted.

The acceptance material are stored in the proper racks/ bins as per identification mark. The materials are issued against a material requisition slip for each specific requirement.

All material are issued along with a job Card for manufacturing. Job card shall contain all the operations and methods in a sequence. Only approved and dimensionally accepted materials are taken up for further manufacturing process.
   TOP
 
The Quality Assurance Engineer carries out inspection and testing at the stages defined in the Quality Assurance Plan for the product. He fills the parts inspection report at stages defined in the Quality Assurance Plan.

He shall also indicate the status (OK/ REJECT) on the parts by means of a stickers which shall be recorded in the in-process inspection Register. Product assembly shall be made in accordance with manufacturing plan/ drawing. Quality Assurance Department shall carry out the Hydro Static Pressure Test for Body / Bonnet / before assembly.

Assembly drawing of products, parts, specification lists and materials requisition shall be sent to assembly shop for final assembly of the valves.
   TOP
 
The Quality Assurance Engineer carries out inspection and tests on the products as per the Quality Assurance Plan for the Valves. He shall fill up the final inspection Report. The final inspection "OK" tag shall be signed by the Quality Assurance Engineer for the accepted valves. The final inspection report shall authorized by Quality head.

For rejected valves the Quality Engineers shall mark the products with "REJECT" tag and shall fill-up the final inspection report.

The Quality Assurance Head releases the valves for packing only after the stages specified in Quality Assurance Plan have been completed satisfactorily and all the inspection and test reports are available and authorized by him.
   TOP
 
The Quality Assurance head shall prepare a master list of instruments and gauges along with calibration frequency.

The Equipment shall be calibrated at the defined by on external agency. The calibration shall be traceable to a standard. After calibration, calibration history card of the instruments or gauges shall up dated by the Quality Assurance Head.

The Inspection measuring and test equipments shall be provided with indicator. This indicator shall be a tag or sticker as appropriate. These tags/ stickers shall identify the equipment and shall indicate the calibration status. When the equipment is found out of calibration, the Quality Assurance Head shall assurance and document the validly of providing inspection and test results in the form of a note. All the measuring and test equipment shall be kept under lock and key where practical in dust and grease - free environment.
 TOP
   
 
DESCRIPTION OF TEST APPLICABLE STANDARS
DYE PENETRANT ASME V -ART 6 AND 21
ASTM E165
ANSI B16.34 -ANNEX D
NOT ASSOCIATES
12,   AMBRISH   SOCIETY.RADHA   SWAMI   ROAD,
RANIP ,AHMEDABAD - 382480
E-MAIL: hay_a!asnt2@yahoo,co jn
DHAVALPATEL:ASNTLEVEL-II (UT,MP,MPT,DPT)
M: 9909544611,9374070241
MAGNETIC
PARTICLES ( WET OR DRY)
ASME-V-ART-7 AND -25
ASTM E709
ANSIB16.34-ANNEXC
NOT ASSOCIATES
12,   AMBRISH   SOCIETY.RADHA   SWAMI   ROAD,
RANIP ,AHMEDABAD - 382480
E-MAIL: hay_a!asnt2@yahoo,co jn
DHAVALPATEL:ASNTLEVEL-II (UT,MP,MPT,DPT)
M: 9909544611,9374070241
RADIOGRAPHY API-1104
ASME V-ART-2 AND 22
ASME VII-DIV 1 ANSI B

16.34-ANNEXB
ASTM E94-E446 .E186 , E280
EXRAYTECH INSPECTION SERVICER
7-9-10,    NAVDEEP    ESTATE,OPP.    RUDRAKSH WEIGH   BRIDGE,MEHAMEDABAD   HIGHHWAY  ,
JASODANAGAR, VATVA ,
AHMEDABAD -382445
V.M KUMAR (PROPRIETOR)
ASNT NOT. LEVEL - II RT , UT , MT , PT
MOBILE : 9825023676
EMAIL: exraytechinspection@yahoo.com
ULTASONIC ASME VART 4 AND 23
ASTM VII-DIV 1
ASTM A388
NOT ASSOCIATES
12,   AMBRISH   SOCIETY.RADHA   SWAMI   ROAD,
RARANIP ,AHMEDABAD - 382480
E-MAIL: hay_a!asnt2@yahoo,co jn
DHAVALPATEL:ASNTLEVEL-II (UT,MP,MPT,DPT)
M: 9909544611,9374070241
HELIUM LEAK DETECTIONrong> AS PER STD CUSTOMER DR. RAMANEE
PLASVAC ENGINEERING SERVICES
D-30D-30/B. DIAMOND PARK,G.I.D.C ESTATE NARODA,
AHMEDABAD - 382 330 PH:- 079-22800722
FAX:- 079-22800723
PMITEST AS PER STD CUSTOMER DIVINE LABORATORY SERVICES
PLOTPLOT NO. 14,GOPAL INDUSTRIAL ESTATE,
OPP.VALLABHNAGAR, ODHAV, AHMEDABAD-382415
PHYSICAL&CHEMICAL TESTING AS PER RELEVANT DIVINE LABORATORY SERVICES
PLOTPLOT NO. 14,   GOPAL INDUSTRIAL ESTATE,
OPP.VALLABHNAGAR, ODHAV,    AHMEDABAD-382415
     TOP
     
     
Copyright@ 2010  All rights reserved.